Related Posts
  • Blog Post: Aside -- Hot, Flat, and Crowded

    Thomas Friedman plans new Chapter 18 for "Hot, Flat, and Crowded" (#4 on NYT Best Seller list). http://www.thomaslfriedman.com/ Check out page 281 where Friedman explores how "designing green was how [TI] saved green." Migrated from tinergy.net and posted by TI communicators who follow...
  • Blog Post: Reality Fab

    This week the final piece of a very unique project came into place at last. TI announced that the 220,000 square foot Richardson Fab (RFAB) is open for business. Pending final regulatory approval and other conditions, TI will acquire a large quantity of 300mm manufacturing tools from a bankrupt manufacturer...
  • Blog Post: TI opens world’s most advanced analog manufacturing facility in the U.S.

    Today, TI announced the opening of RFAB, a new manufacturing facility in Richardson, TX. RFAB will be the world’s only production facility to use 300-millimeter silicon wafers to manufacture analog chips, and the first phase of production will be capable of manufacturing more than $1 billion worth...
  • Blog Post: Follow the LEED

    Back in 2004 TI was the first semiconductor manufacturer to register a wafer fab for LEED-NC Certification when we began the Richardson FAB (RFAB) design. LEED, which stands for Leadership in Energy and Environmental Design, has become the predominant green building rating system in the U.S. and is being...