Team,
I’m using the GUI on the EVAL card to generate a ramp. I’ve also tied in an external trig to TRIG2 pin and setup for the ramp to start in the GUI from this TRIG2 pin. Around what delay time should I expect from the time the TRIG2 edge goes positive and the time the first ramp starts?
Thank you.