Hi,
I am working on a small project to control an isolated cuk converter using two DSp's .
one of the DSP need to control the Primary side switch and the other is required to control the Secondary side switch. For doing so, i need to properly synchronize the two DSp's. is it possible to do so ? if so, what approach should i follow?