This thread has been locked.

If you have a related question, please click the "Ask a related question" button in the top right corner. The newly created question will be automatically linked to this question.

3-Phase power meter MSP430F677x serial terminal problem

I'm trying to connect Three-Phase Electronic Watt-Hour meter MSP430F677x(A) to IDK am437x using UART , when i connect the 3-phase power meter to PC through RS-232 connection using provided GUI every thing works fine but I can't see the data sent between the GUI and the Kit using terminal program like (Putty) ,so i'm not able to figure out  the list of command to be sent from the GUI (as it uses .dll files) to kit .If you could help me to figure  the list of commands to be sent that would be a great help. 

Thanks in advance .

  • I m waiting for the response from the TI support team,

    I can see my engineer message was reviewed but no comments from the TI support team which is very strange to me knowing that the kit is being in production for long.

    I hold on, and wait for response form TI before making raising the red flag

  • It's a good idea to put some information about the question in the title of the post rather than just calling it "Question". You're more likely to get a response from someone who knows about the specific issue that way. The original poster should have the option more->edit on their post which will let them change it.

    Already done. Thanks!

**Attention** This is a public forum