TI E2E support forums
TI E2E support forums
  • User
  • Site
  • Search
  • User
  • E2E™ design support >
  • Forums
    • Amplifiers
    • API solutions
    • Audio
    • Clock & timing
    • Data converters
    • DLP® products
    • Interface
    • Isolation
    • Logic
    • Microcontrollers
    • Motor drivers
    • Power management
    • Processors
    • RF & microwave
    • Sensors
    • Site support
    • Switches & multiplexers
    • Tools
    • Wireless connectivity
    • Archived forums
    • Archived groups
  • Technical articles
  • TI training
    • Tech days
    • Online training
    • Live events
    • Power Supply Design Seminar
  • Getting started
  • 简体中文
  • More
  • Cancel


Search tips
Showing 82 results View by: Thread Post Sort by
  • BQ2004: Can the BQ2004 support charge the NiCd cells?

    cn li
    cn li
    TI Thinks Resolved
    Part Number: BQ2004 Other Parts Discussed in Thread: BQ25750 , BQ25820 , BQ24004 Can the BQ2004 support charge the NiCd cells?
    • 2 months ago
    • Power management
    • Power management forum
  • BQ2004: Ni-Cd charger questions

    Kazuki Itoh
    Kazuki Itoh
    Part Number: BQ2004 Hello team, Could you please help me to answer customer questions below? The charging current is determined by the resistor RSNS between SNS pin and GND, correct? The allowed RSNS power is calculated from IREG^2 * RSNS. When…
    • over 4 years ago
    • Power management
    • Power management forum
  • RE: BQ2004: NiMH charger

    Kedar Manishankar
    Kedar Manishankar
    Hi Vadym, VEDV = 0.4 ∗ VCC ± 30mV. The DCMD input is used to command discharge-before charge via the DIS output. Once activated, DIS becomes active (high) until VCELL falls below VEDV, at which time DIS goes low and a new fast charge cycle begins. The…
    • over 5 years ago
    • Power management
    • Power management forum
  • RE: BQ2004: DV2004S1 Demo board

    Vadym Vasylyshyn
    Vadym Vasylyshyn
    Hi Kedar, Yes, I see that V_CELL is not an actual battery voltage but V_BAT voltage that's defined by voltage divider between BAT and SNS pins on the BQ2004. So for 12-cell RB1 = 40k, which at nominal battery voltage(14.4V) an actual V_CELL = 12V…
    • over 5 years ago
    • Power management
    • Power management forum
  • BQ2004: RT1/RT2 Value

    Yoshinobu Kagawa
    Yoshinobu Kagawa
    Part Number: BQ2004 The thermistor to be set in BQ2004 is planned to be 103KAT-4/SEMIETC. The heat dissipation and heat time constants are different from the 103AT-2/SEMIETC described in DV2004L1, what values ​​should be set for RT1 and RT2? Best…
    • over 5 years ago
    • Power management
    • Power management forum
  • BQ2004: VIN/VCC

    Yoshinobu Kagawa
    Yoshinobu Kagawa
    TI Thinks Resolved
    Part Number: BQ2004 Is there a limit to the input order of VIN and VCC of bq2004? Normally it is VIN-->LDO (DCDC --> VCC this time). If batteries are present, I think the VCC will be powered first. I attached block diagram. Could you please check…
    • over 5 years ago
    • Power management
    • Power management forum
  • BQ2004: How to config BQ2004 always in trickle charging mode?

    James Chen3
    James Chen3
    TI Thinks Resolved
    Part Number: BQ2004 Other Parts Discussed in Thread: BQ24725A , BQ24610 , BQ24170 Hi E2E support team, Our customer request 4 cells 1520mAh NiMH pack(4S1P: 1.2Vx4 = 4.8V) with trickle charging supported. Please advise how to config BQ2004 with default…
    • over 7 years ago
    • Power management
    • Power management forum
  • BQ2004: BQ2004 - NiMH charger for the function of over discharging protection

    Jason Dai
    Jason Dai
    TI Thinks Resolved
    Part Number: BQ2004 Other Parts Discussed in Thread: BQ24190 Dear E2E, customer is looking for NiMH battery charger solution with the function of over-discharge protection. I didn't see power path FET in reference circuit. could this part have the…
    • over 7 years ago
    • Power management
    • Power management forum
  • Answered
  • BQ2004: BQ2004H stops Charging after 23 Min

    Fabian Graefe
    Fabian Graefe
    Resolved
    Part Number: BQ2004 I try to charge a two or three cell NIMH Akku using a BQ2004H. Charging stops always after 23 minutes. Can You give me a Hint what i am doing wrong? Regards Fabian Here is the configuration: VCC 5V stabilized DCMD VCC …
    • Resolved
    • over 5 years ago
    • Power management
    • Power management forum
  • RE: BQ2004: Delta T/ Delta t termination condition

    Kedar Manishankar
    Kedar Manishankar
    Hi Kevin, Yes, Delta T/ Delta t and maximum voltage detection (Peak Voltage Detection (PVD)) will occur simultaneously and if one or more of these conditions are satisfied, then termination will occur. For PVD, VSEL should be pulled high, and for -delta…
    • over 6 years ago
    • Power management
    • Power management forum
>

Didn't find what you are looking for? Post a new question.

  • Ask a new question