Part Number: ADC3683-SP
Hello
following the guide in device confiugration of the datasheet (SBASAB5A – MARCH 2024 – REVISED DECEMBER 2024, p.44, Table 7-7) left me with a question. Is it necssary to do step 2 (bit mapping, E-Fuse loader) as second setp or could it be done at the end of the programming sequnece?
Thanks!
BR