Hai,
We want to design a circuit similar to the TIDA-010232 for Insulation resistance measurement for our battery operated EV Vehicle.
From the reference design we will face an issue of continuous discharge through the HV Bus monitoring circuit ( R34 to R47).
This load is active even after the Vehicle is completely shutdown which causes the discharge of the battery ( even though it is very minimal it is a continuous ).
Without using any additional switches can we change the existing circuit to avoid this problem.
Regards
Venkat