Tool/software:
hi,
just to be 700% sure, is there any power sequencing constrain on the DRV8350x (VM, VDRAIN, etc.) that we need to meet?
For example, by power up, first Vdrain will be powered up and after that Vm, and after Vm, our microcontroller will be powered up.
By power-down, at first Vm will be dropped, and consequently the logic power supply regulators will be disabled.
thx
Vincenzo