Hi Team,
1. "dv/dt rate on Vout" suggested to used 4V/mS ?
2. "Target Fault Time" suggested to used ? mS
3. "actual SS capacitance" is Fig.2 "Cdv/dt" ?
4. "Actual Timer Capacitance (pick one smaller than CT,CALC) " is Fig.2 "CTIMER" ?
5. What does the time and W in the red circle mean? Fig. 3

Fig. 1

Fig.2

Fig. 3