BQ78350-R1: BQ78350 _ R3

Part Number: BQ78350-R1
Other Parts Discussed in Thread: BQ78350, BQSTUDIO

Tool/software:

Hi Team,

we are using BQ78350.

In our application we are shutdown the BQ78350. after that when we again wake up, we see the OCV estimation and in next cycle we are facing SOC jump issue at EDV2. Our Actual capacity is 50 AH, but I am configuring it 46.5 AH in both Design & FCC because I want to reduce the voltage window in other word to reduce the DOD. but I OCV estimation use a full voltage window from 4.18 to 2.5 cell voltage. Need support on it.

1. Design & FCC = 46.5 AH

2. DOD at EDV 2 = 15232

3. Battery Low % = 7%

how can I reduce the voltage window limit in OCV estimation.

Regards,

Hardik