Hello,
I am looking into using a high temperature board design using the TPS62000SHKK. I noticed that the footprint has very long leads. I am wondering what the purpose is for this. In a buck regulator, we normally want to minimize the areas of the hot loops, so will want to place the components as close to the pins as possible. However, the pins extend out very far. So the question is why are the pins so long, and what are the recommendations for this layout-wise?
Thanks!
Theo