This thread has been locked.

If you have a related question, please click the "Ask a related question" button in the top right corner. The newly created question will be automatically linked to this question.

TPS650864: TPS650864 Power up sequencing configuration method

Part Number: TPS650864
Other Parts Discussed in Thread: TPS650861

Hi Expert,

I want to confirm if my understanding about TPS650864 Power up sequencing configuration method is right.

According to datasheet 6.10 Power Sequencing and VR Control, there are three different ways of sequencing the rails during power up and power down, I want to confirm my understanding about CTRx control and PGOOD control. 

1. For CTRLx control, I just need to connect CTRL1~CTRL6 pins to my FPGA GPIOs, then use FPGA code to configure the power rail sequence, right?

2.For PGOOD control, I just need to connect CTRLx to the power Good of its prior rail, right?

3.But for PGOOD control, there is only 4 GPO pins, so there are only 4 hardware PG pins can be used to connect with next power rail CTRLx, how can I control 6 power rails sequence? 

Thank you & best regards

Rachel