This thread has been locked.

If you have a related question, please click the "Ask a related question" button in the top right corner. The newly created question will be automatically linked to this question.

LMQ61460-Q1: Switching power loss

Part Number: LMQ61460-Q1

Hi Team,

Our customer would like to confirm which timing they have to consider for calculating the switching power loss, the switch node rise time (2.7ns) or the minimum LS switch on time (85ns). 

Regards,

Danilo