Please review the attached schematic. I want to make sure we aren't going to have issues with the power up sequencing on the DSP. The TI power guys are saying COUT is too large on VR2, while the C6748 errata says the additional load(C2) is necessary. Please also verify the PG outputs from the DC-DC converters will power up the rails correctly.
Thanks, Dean