This question is directly related to this post:
Is there a way to get a list of the tests that TI performed for this QDID? The new TCRL requires that GATT 4/25 be selected. The combination of 4/25 being selected and GATT 4/16 (which was already selected) potentially adds a new test. If I could get a list of tests that were performed I can verify if we need to perform this test or verify if TI already performed the test.
Thanks,
Bert