This thread has been locked.

If you have a related question, please click the "Ask a related question" button in the top right corner. The newly created question will be automatically linked to this question.

TLV320AIC3100: Power ON sequence

Part Number: TLV320AIC3100


The power ON sequence is specified in the data sheet as follows.
1. Power up SPK VDD
2. Power up IO VDD
3. Power up DVDD shortly after IO VDD
4. Power up A VDD and HP VDD


In my system, the power sequence is as follows.
Please advise if this is allowable.


1. Power up SPKVDD
        wait 3ms
2. Power up HPVDD, AVDD and IOVDD at the same time
        wait 4.5ms
3. Power up DVDD