The power ON sequence is specified in the data sheet as follows.
1. Power up SPK VDD
2. Power up IO VDD
3. Power up DVDD shortly after IO VDD
4. Power up A VDD and HP VDD
In my system, the power sequence is as follows.
Please advise if this is allowable.
1. Power up SPKVDD
wait 3ms
2. Power up HPVDD, AVDD and IOVDD at the same time
wait 4.5ms
3. Power up DVDD