AFE5818: Power up/down sequence

Genius 17325 points
Part Number: AFE5818

Tool/software:

Hello,

I have some questions for power up/down sequence of AFE5818.

1)
The recommended power seqeunce on the datasheet is DVDD_1P2 first.
After rising DVDD_1P2, isn't any specific sequce for all other rails reqruied?

2)
The datasheet says that DVDD_1P2 must rise before AVDD_1P8.
Does it menas all other rails, can DVDD_1P8, AVDD3P3, AVDD_5V rise before both DVDD_1P2 and AVDD_1P8?
Or DVDD_1P2 have to be the 1st  in any situation?

3) 
The datasheet doesn't metion anything power down.
DVDD_1P2 must be last? Or DVDD_1P2 must be after AVDD_1P8 and other rails are don't care?

Regards,
Oba

  • 1) No , Only DVDD_1P2 sequence is important 

    2) It is recommended to follow DVDD_1P2 at first followed by other supplies 

    3)  You can follow inverse of power up sequence for power down . That is DVDD_1p2 is last .