Part Number: ADS131A02
Other Parts Discussed in Thread: ADS131A04
When designing a three-phase power monitoring system using multiple ADS131A02 devices in a daisy-chain configuration, what are the key SPI timing and synchronization constraints to ensure accurate simultaneous sampling across all channels, and how should the DONE signal be routed to avoid phase mismatch between devices?