Other Parts Discussed in Thread: CONTROLSUITE
Tool/software: Code Composer Studio
Hi, I am using TMS320F28035 . I have written a very basic simple code for boost converter . within ISR i am reading ADC readings and multiplying result with some scaling factor and after that standard formula for boost converter . When i measured clock cycle for ISR it taking 965 clock cycle , but here within this ISR just 2 -multiplications , 1 division , and 3/4 - data transfer . So my question is why it taking so many clock cycles . As per data-sheet of controller it is given that it this controller can do 32x32 multiplication within single clock cycle .
How can I reduce clock cycles??
Thanks and Regards,
Indrajit.
