Hello engineer,
There is a problem with the products made with the BQ40Z50-R1 scheme. When the host sends a lot of inquiry information to BQ40Z50-R1, the BQ40Z50-R1 will be abnormal (turn off the output); In this case, if HPE and CPE are closed, no exception will occur