This thread has been locked.

If you have a related question, please click the "Ask a related question" button in the top right corner. The newly created question will be automatically linked to this question.

LM25141: Minimum turn on time and Minimum switch node pulse width

Part Number: LM25141
Other Parts Discussed in Thread: LM25148

Hi fellow members, I'm currently working on a design for a buck converter using the LM25141.  

May i ask whether the minimum turn on time and the minimum switch node pulse width, tsw are the same? 

If yes, why is the minimum turn on time is 66 ns and the minimum switch node pulse width is 70 ns?

If no, what is meant by the minimum switch node pulse width,tsw?

Thanks.