Tool/software:
The package structure of TLV62569ADRLR is different between the one obtained in the past and the one obtained this month.
Which one is correct, and would you let me know why it was changed?
(Changed from Bond Wire to Copper Post)
For your reference, the PCN was issued in February 2023, so I guess there was a change at that time.
[Old]
[New (2024' Jun)]
Best regards,
Satoshi