Other Parts Discussed in Thread: BQ25619
Tool/software:
Hello TI,
You can find the part of the schematic below:
I was wondering how to connect BATSNS pin.
The best way is to connect to point B, near the battery connector and after the load switch, right?
But in case the load switch is turn of and no power is going to the BQ25619, is he charger can handle a voltage (VBAT) on BATSNS pin?
Thank you