Tool/software:
Hello,
We are designing a Priority Power MUX for a 24-36V input with a 10A rating and need guidance on implementation. Our requirements:
- Primary (Power Adapter) should be selected when both inputs are available.
- Secondary (Battery) should be used only if the Primary is unavailable.
- Seamless switching with minimal voltage drop is preferred.
Could you suggest the best approach? Additionally, if you have a reference schematic to achieve this design, it would be very helpful.
Thanks in advance!
Regards,
Sivam Natesan