Other Parts Discussed in Thread: BQ24617
Tool/software:
Can multiple 4s2p cell packs be placed in parallel with each pack having its own BQ40Z80 BMS and then there own BQ24617 for charging and then charging them from a common external power supply with the appropriate current rating (say 3A per pack) What are the pros and cons and the pitfalls to avoid? Is there a better way to do this? Can all of the outputs be tied together to run the load?