Tool/software:
Ideally, we want to minimize the number of wires because our connectors are large and expensive.
I see we can communicate over 1-wire, and I see there is an ENAB + GPO pin. Does this seem correct, the lowest number of wires we would need from pack to system?
- HDQ (1 wire)
- thermistor (battery charger generally needs this for JEITA reasons)
- Pack +
- Pack -
Thanks! - Cameron
I think we could ground Enable and ignore GPO