This thread has been locked.

If you have a related question, please click the "Ask a related question" button in the top right corner. The newly created question will be automatically linked to this question.

How to resequence rails after incoming power rail comes good

Other Parts Discussed in Thread: UCD90120A, UCD90120

Hi,

Please find attached my UDC90120A design

The board is powered from the P3V3_PREFET and PVPWR rails. Some additonal rails are sequenced depending on these 2, others are just monitored by the UCD90120A.

I've got my power-on sequence working

If P3V3_PREFET and PVPWR are both good, step1) enable P1V0, step2) enable P1V8 and P2V0, step3) enable 'others'

I've got my power-off sequencing working

If either PV_PWR or P3V3_PREFET fail, step1) disable 'others', step2) disable P1V8 & P2V0, step 3) disable P1V0 [i.e. the reverse of the power-on sequence]

So next I want to resequence my rails in the event of a failure, ie if either P3V3_PREFET or PV_PWR go 'bad' and the rails sequence off, I then want to sequence them back on again once the incoming rail comes good again. I've experimented with the demo board and different combinations of the retry/resequence options but to no avail.

Any chance someone could give me some pointers to get this functionality in the GUI (either a step-by-step guide or by modifying my attached design) - I'm using V1.8.211 as the latest version seemed to crash lots...

I have no processor/PMBusMaster, the UCD90120 is operating without any external inputs.

Thanks in advance,

Bruce.