Hi,
For TPS51200, REFOUT is generated from REFIN using internal opamp voltage follower. What is the maximum delay for the REFOUT ramp up after REFIN is available ?
In our case, REFIN (0.675V) is generated from 1.35V using resistor divider configuration.
Regards,
Elvin