This thread has been locked.

If you have a related question, please click the "Ask a related question" button in the top right corner. The newly created question will be automatically linked to this question.

About using phase shift full bridge for high battely charger.

Other Parts Discussed in Thread: UCC28950

Hi,

I'm considering a battely charger system under this condition, AC input voltage is to 270V from 80V and maximum output is 800watts.

I know Phase Shift Full Bridge well , and i think that it is most major and popular.

I'm going to use UCC28950 for PSFB.

I have a impression that  LCC method is difficult to control.
Please tell me if there is recommended for another solution ithat PSFB useing UCC28950.
thanks.