Hello :)
I actually want to design an active PFC PSS with the UCC28180 Controller.
There is an Excel Calculation Tool, but now there are some differences between the Datasheet and the Design Calculator.
The value of M1*M2 on Datasheet p 30 and the value at the M1M2 at the Excelsheet C180.
Why is there a difference?
Is there any other way to calculate Vcomp?
Thank you!
Chris