Hello.
I have a question about UCC256303.
We are studying in the direction not using OVP at UCC256303.
OVP is detected at the BW terminal from the sub winding of the transformer.
We are studying in the direction not using OVP at UCC 256303.
OVP is detected at the BW terminal from the sub winding of the transformer.
If you do not use BW PIN, can BW-PIN processing be directly connected to the primary GND?
Also, please let me know if you have any precautions.
thank you.