We don't have a programmable voltage charging mechanism so we think we HAVE to use DISCHARGE-BEFORE-CHARGE ([LSM] = 1) to use EOS. In the TRM, 2.11.1.2 Learn Charge Phase, it does not specify what parameters dictate the current that will be requested during the Learn Charge Phase. If we are not using the bq34110 requested current for charging (we control charging with our own algorithm), what happens if we charge at a current that is 100 mA higher (~30% higher than the 210mA of Learn Charge Current) than the bq is requesting? Will that be a problem?