This thread has been locked.

If you have a related question, please click the "Ask a related question" button in the top right corner. The newly created question will be automatically linked to this question.

BQ77915: load connection

Part Number: BQ77915
Other Parts Discussed in Thread: BQ77905

Hi,

we are working on bq77915 for battery protection. we have a 3s configuration. Instead using pack -ve terminal to connect the load, can the load -ve terminal be connected between the Fet drain terminals? we want to add a functionality to our design where the load is given high priority when the adapter is connected to the system ( Eg: if the load and adapter are connected to the system, the load load should be met by the adapter).

Is there any way to achieve this functionality ? 

Thank-you