First of all, TI's support system / forum system is just horrible. I just want to ask a question, not send a post or read them. Called support and India answered. Anyway:
I have a battery with these specs: charging cutoff voltage: 4.35 V, discharge cutoff voltage: 2.5 V.
It is our intention to utilize this range to the maximum extent possible. To that end, what are the tolerances for OVP and UVP listed in the BQ297xx datasheet page 3?
It appears that in order to fit our requirements as closely as possible, a non-standard part is needed as shown by the BQ297xy part number in the table on page 3. What is the lead time for such a request? We will only need a small quantity (<100 probably)
For the BQ29700EVM-610 eval kit:
1.) Is it possible to order with a component other than the BQ20700, either a standard part (such as BQ29732) or the aforementioned BQ297xy? If so, what would the lead time be?
Thank you