Hi,
My customer just started evaluation on IWR6843AOPEVM.
He tried OOB demo first and it worked fine, but he noticed the heat sink was pretty high temperature.
According to below application note, the temperature can be reduced if RF duty cycle is low.
(See Figure 11 for example)
https://www.tij.co.jp/jp/lit/an/swra672/swra672.pdf
He want to try to reduce the duty cycle in OOB demo.
Is it possible to control duty cycle from OOB demo visualizer?
If yes, could you tell me how to do that?
If no, what is easiest way to try it?
Thanks and regards,
Koichiro Tashiro