This thread has been locked.

If you have a related question, please click the "Ask a related question" button in the top right corner. The newly created question will be automatically linked to this question.

AWR1443BOOST: How to power cycle AWR1443BOOST?

Part Number: AWR1443BOOST

Hello,

I'm trying to flash CCS debug firmware. I need to power cycle the device before I load images. Is there a button to power cycle the device on the EVM or I just simply remove the power and power up the EVM again?

In addition, is the attached file ADC Data Capture SDK1.05 V1.00.pdf outdated because the latest SDK version is 1.1.0.2 or I can still follow the steps in this file?4353.ADC Data Capture SDK1.05 V1.00.pdf

Thanks,

Yun

  • Hi Yun,

    Power cycling means removing power to the EVM. You'll need to power cycle the board before you flash it and then remove the SOP2 Jumper and power cycle it afterward. If there are two red LED's on when you apply power to the board then simply press the reset button (NRST) and it should go away.

    Current guide for Capture demo is still valid with the new SDK, although that is definitely a good question.


    Cheers,
    Akash