Hello,
I had installed CCS6.0 (parallel to CCS5.5) and experienced some problems (details can be found in the thread below).
http://e2e.ti.com/support/microcontrollers/hercules/f/312/p/347834/1228960.aspx#1228960
So I have uninstalled CCS6.0. But CCS5.5 doesn't work anymore.
I have observed the following phenomena:
1. Start CCS5.5, open a target configuration (LC4357). Test Connection, OK.
2. Launch the target configuration (LC4357), after a few seconds, CCS5.5 crashes (the window disappears).
3. Re-start CCS5.5, I get the error message saying that the workspace specified is in use.
4. Check in the task manager, there is a process ccstudio.exe *32 running. After ending this process, CCS5.5 can be started. But the error at step 2 happens again.
I had un-installed CCS5.5 and re-installed it to avoid any potential problems caused by my previous parallel installation of CCS6.0 and CCS5.5. This doesn't solve the problem
Before I uninstalled CCS6.0, I had a few error log files sent to TI. Please see attachment. 3108.error_Log.zip
Thank you and best regards,
Libo