Part Number: CC1352P7
I am considering the CC1352P7 for my application.
All wireless nodes under the gateway/coordinator shall be meshed to form redundant paths. Zigbee protocol satisfies this requirement and we are ok to have all routers as Mains powered.
All sensors including Line powered routers would generate data on demand when an event occurs such as Door Open, Person detection, a button press during emergency/need etc. The notification would be delivered to system via coordinator with low latency. What would be a typical latency over X number of hops for packet to be delivered to Coordinator from a wireless node and vice versa?