Other Parts Discussed in Thread: CC2530
Hi
I'm using ZigBee and CC2530 chips with HA profile to control 200+ light nodes. For pilot test, I have 10 drivers that I can control them using PWM.
I have a basic question. what would happen if I loose my coordinator and need to replace new one? seems that NV_Restore is enabled on all device!
Do I need to basic reset (press a key) all 200 nodes to make them ready for a new join? Any other optimum solution?
Thanks
Behnam