TUSB8020B: Power-Up Timing Requirements of VDD33 and VDD

Part Number: TUSB8020B

Hi support team,

According to section "7.6 Power-Up Timing Requirements", I understand that VDD33 rising after VDD is a timing violation.
"VDD33 stable before VDD stable."

However, according to section "8.3.5 Power-Up and Reset", it says that there is no timing requirement for VDD and VDD33.
"The TUSB8020B does not have specific power sequencing requirements with respect to the VDD or VDD33 power rails."
Does this mean that if the 4 bullet points are met, it's okay for VDD to rise first?

Regards,
Dice-K