Part Number: DS90UB947-Q1
Tool/software:
Hi team,
My customer have additional questions about Power-Up Requirements from previous thread.
1. You mentioned with below comment;
> t2 begins whenever the OLDI CLK has stabilized (with +/- 0.5% variation).
How to judge OLDI CLK has stabilized?
2. Seeing from requirement, it seems VDD11 should start up faster than 1.5ms. The most of Primary DCDC can not meet the requirement.
What kind of risk hidden if they cannot fulfill the requirement? They need to consider Secondary DCDC with faster start-up than 1.5ms. Is this correct?
Regards,
Youhei MIYAOKA