Part Number: DS90UB941AS-Q1
Hello TI Support,
Regarding the DS90UB941:
Our power supplies are 1.8 V and 1.1 V. We plan to power up the 1.1 V rail first, followed by the 1.8 V rail, with a 1 ms delay between the two power sequences.
Could you please confirm if this power-up sequence is acceptable?
Additionally, is it permissible to delay the assertion of the PDB pin to align with this power sequencing?
Thank you.
