Dear SIr
GRL test fail with TPS65986 as below , may I know to solve this issue or where could I check
Protocol_Ellisys
This thread has been locked.
If you have a related question, please click the "Ask a related question" button in the top right corner. The newly created question will be automatically linked to this question.
Hi Kai
Most common issues with failing Ellisys testing is because of a mismatch in VIF information with DUT.
Can you do the following:
Regards,
Jimmy Hua
Dear Jimmy
OK!! I understand your means
you could see our test result have a "PUT must advertise Rp terminations" fail
May I know where can I config this in "TPS6598x Snapshot 3_05 GUI" ??
|
TD.4.2.1 Source Connect Sink - Testing Downstream Port |
||
|
PASSED |
Applying Sink Terms |
PUT_R must transition to Unattached.SRC |
|
FAILED |
Applying Sink Terms |
PUT must advertise Rp |
|
PASSED |
Applying Sink Terms |
PUT must enable VBUS within 100 ms to 475 ms (actual was 152 ms) |
|
PASSED |
Applying Sink Terms |
PUT must stabilize VBUS before initiating USB PD communications |
|
PASSED |
Applying Sink Terms |
PUT must disable VBUS within 670 ms (actual was 14.3 ms) |
|
TD.4.2.2 Source Connect Sink Accessory - Testing Downstream Port |
||
|
FAILED |
Applying Unattached.Accessory Terms |
PUT must advertise Rp terminations |
|
PASSED |
Applying Sink Terms |
PUT must enable VBUS within 100 ms to 475 ms (actual was 109 ms) |
|
TD.4.2.3 Source Connect DRP - Testing Downstream Port |
||
|
FAILED |
Applying Sink Terms |
PUT must advertise Rp terminations |
|
PASSED |
Applying Sink Terms |
PUT must enable VBUS within 100 ms to 475 ms (actual was 108 ms) |
|
PASSED |
Applying Sink Terms |
PUT must be ready to establish a contract |
|
TD.4.2.4 Source Connect Try.SRC DRP - Testing Downstream Port |
||
|
FAILED |
Applying Sink Terms |
PUT must advertise Rp terminations |
|
PASSED |
Applying Sink Terms |
PUT must enable VBUS within 475 ms (actual was 108 ms) |
|
PASSED |
Entering Try.SRC |
PUT must disable VBUS within 670 ms (actual was 9.18 ms) |
|
FAILED |
Entering TryWait.SNK |
PUT must enable VBUS within 475 ms |
|
PASSED |
Entering TryWait.SNK |
PUT must be ready to establish a contract |
|
TD.4.2.5 Source Connect Try.SNK DRP - Testing Downstream Port |
||
|
FAILED |
Applying Sink Terms |
PUT must advertise Rp terminations |
|
PASSED |
Applying Sink Terms |
PUT must enable VBUS within 100 ms to 475 ms (actual was 108 ms) |
|
PASSED |
Applying Sink Terms |
PUT must be ready to establish a contract |