Hi,
I would like to ask the Power up timing requirements of the datasheet.
I think that (1) is mentioned about the time from power-on to the GSTz, however the td1 is specified the time of relation during VDD and VDD33.
What is relation between td1 and note(1)?
About note(2), what does "power-on relationship" mean?
Best Regards,
Kuramochi