This thread has been locked.

If you have a related question, please click the "Ask a related question" button in the top right corner. The newly created question will be automatically linked to this question.

DS90UB914A-Q1: Power-Up Requirements

Part Number: DS90UB914A-Q1

Hi Team,

I have a question on the DS90UB914A-Q1 data sheet " 11.1.2 Power-Up Requirements and PDB Pin " content.


In the power supply sequence currently being designed, PDB is input immediately after VDDIO.
Does this not work? Although it is natural to observe the power supply sequence, is there no problem if PDB is input before VDD_n?

Best Regards,
Ishiwata