Could you let me know two supply configuration power up sequence?
In datasheet figure 115, we can see two supply sequence diagram.
However, customer power up sequence is like below since 2.5V and 1.1V don't turn up at the same time.
In that case, questions here are
1. Which one should turn up first, 2.5V or 1.1? or there is no restriction?
2. what is t3 time(max)?
3. which one is the starting point of t4? 2.5V or 1.1V? first turn up power or second one?
4. Is it ok to consider that t4 is the same as t2 50ms_max(table 101. two supply sequence)?