Hi!
For negotiated voltage change (9-15V) what is the TPS65981 timimg from switching GPIO7,8 to PP_5V0 to PP_HV switch turn on?
uS, msec or?
This thread has been locked.
If you have a related question, please click the "Ask a related question" button in the top right corner. The newly created question will be automatically linked to this question.
Hi!
For negotiated voltage change (9-15V) what is the TPS65981 timimg from switching GPIO7,8 to PP_5V0 to PP_HV switch turn on?
uS, msec or?
Hello,
This spec is defined within the datasheet as TON_HV which is 8ms from enable to VBUS = 95% of PP_HV voltage
Hi Adam and thanks,
Can you elaborate why we recommend to slew rate control the DC/DC that is mentioned in the below thread?
https://e2e.ti.com/support/interface/f/138/t/688876
The 9-15V slewing will be done long before the PP_HV switch turn on hence you will have a really high not allowed +30mV/us at the Vbus?
Or did i miss something?
Hello,
The fastest slew rate for a compliant Type-C PD device is defined within the PD spec. That is why the referenced E2E post states that you cannot have a slew rate faster than 30mV/us.
The 9-15V slewing will be done long before the PP_HV switch turn on hence you will have a really high not allowed +30mV/us at the Vbus?