Other Parts Discussed in Thread: SN74LVC2T45-Q1
I see the following in the SN74LVC1T45-Q1 datasheet:
A proper power-up sequence is advisable as listed in the following:
1. Connect ground before any supply voltage is applied.
2. Power up VCCB.
3. VCCA can be ramped up along with VCCB.
This is at odds with the sequencing for other T45-series parts, such as the SN74LVC2T45-Q1, which recommends that VCCA be powered up simultaneous with or before VCCB. I want to verify that the datasheets are both correct, and that the power sequencing recommendations for the two parts are in fact different. Thanks!