Hi there,
the datasheet (May 2012) of the TPS65381 says on page 38:
- The SDI line is sampled on the falling edge of SCLK.
- The SDO line is shifted out on the rising edge of SCLK
But the timing diagram on page 10 seems to be different:
- Tsusi = setup time at SDI: setuptime of SDI before the rising edge of SCLK
- Td2 = time delay from falling edge of SCLK to data valid at SDO
Which is correct?
Best regards, Andy