Other Parts Discussed in Thread: TPL5010,
Our customer's instrumentation mainly uses the hardware design scheme of TPL5010+MSP430. Now I want to remove the external watchdog IC and use the MSP430 internal clock as a watchdog,As shown in the figure below, we want to remove this part of the circuit and directly control it by the MSP430。


External 8s clock timing to prevent MCU downtime and affect water metering。They want to remove the external watchdog IC TPL 5010, using MSP430 internal watchdog, is this method OK? Are there any reference designs and applications?